OMMATIXTWINDigital Twin Platform

Nkuku Field Digital Twin

Field-specific concept twin for the Nkuku and Ikong fields. Source records are kept apart from interpretation, assumption and simulation. Nothing here is a live feed.

WORKSPACE
DATA MODE
ALTITUDE
OVERLAYS LABELS

Operational timeline

HISTORICAL
SIMULATION
FORECAST
No forecast populated. Needs a validated reservoir and production model.

Historical items come from the company website and carry their verification status. Simulation events are generated by the twin. Tap any item.

Engineering workspaces

Version history this twin

Next upgrades

Path to first oil reservoir to cargo tank . live

Tap a block to open its camera and details. A gold outline marks an OmmatixTwin service line.

Production history twin historian . live

Hover or tap the chart to read a sample.
Table view, hourly samples
Twin timeOil bopdWater bwpdGas MMscf/dBS and W per centWell

Each sample is 10 minutes of twin time and one is taken every second, so a full 24 hours fills in under two and a half minutes. History before the page opened is backfilled from the twin model at the starting choke, assumed. All values are simulated.

Predictive health remaining useful life

Development roadmap

Phase 1, conductor support platformFabricated by CMES, installed by VMI and CMES
REPORTED
Phase 2, extended well test to FSOTest spread, produced water package, flowline, spread moored FSO
CONCEPT
Phase 3, FPSOFull field process and export tied back to the CSP
CONCEPT

Phase sequence from the earlier CMES and VMI announcement used in twin v1 (S24). It is not confirmed by the company website reviewed on 20 Oct 2026, which describes a phased plan led by appraisal drilling (S19). No FSO, FPSO, EPF, platform or pipeline has been selected in any supplied document. Layouts are concept placements, not to scale.